A full maintenance of the vessel's steering gear was carried out; hydraulic and mechanical parts were checked and renewed.
Work Carried Out
- Disassembly and cleaning
- Inspection of hydraulic and mechanical parts
- Renewal of worn parts
- Reassembly and steering test
Job Details
A planned full maintenance was carried out on the vessel's steering gear. Hydraulic pumps, the valve group, rams and mechanical linkages were checked step by step to assess the system's overall condition.
The system was dismantled and cleaned; worn gaskets, seals and bushes were renewed. Hydraulic oil and filters were changed and the system bled. The rudder stock connection and lubrication points were inspected.
After assembly, hard-over to hard-over tests were performed, checking rudder times, pump changeover and alarm functions.
Checks Performed
- Hard-over to hard-over time
- Pump changeover and alarms
- Leak and pressure check
- Oil and filter condition
Outcome
The steering gear was tested and handed over ready for safe navigation.
Related service: Onboard Technical Service



